Size & layout
The number of outlets, lights and circuits, and how far they are from the panel.
A great remodel needs wiring that’s planned, permitted and built for how you’ll live. We connect homeowners and builders with a licensed remodel electrician in Santa Ana for kitchens, bathrooms, room additions, garage conversions and ADUs.
Every remodel changes how a home uses power. These are the projects Santa Ana homeowners and contractors call about most.

New circuits for appliances, countertop outlets, island power, and layered lighting.

GFCI-protected circuits, vanity lights, exhaust fans and heated floors.

New rooms, second stories and expanded living areas wired from the ground up.

Turning a garage into living space with new outlets, lights, heating and smoke alarms.
Kitchens use more power than any other room, and code sets clear rules for them. Planning these early avoids changes after the drywall goes up.
| Item | What code and good practice usually call for |
|---|---|
| Countertop outlets | At least two 20-amp small-appliance circuits, GFCI protected, spaced so no point on the counter is far from an outlet. |
| Dedicated circuits | Dishwasher, disposal, built-in microwave and refrigerator often get their own circuits. |
| Range or cooktop | Electric and induction ranges need a large 240-volt circuit. |
| Islands | Island outlets and pendant lights, planned before the floor and cabinets go in. |
| Lighting | Recessed, pendant and under-cabinet lighting that meets California’s Title 24 energy rules. |
Bring the electrician for kitchen remodel planning in early, before cabinets are ordered. They can confirm panel capacity for new appliances, plan outlet and lighting locations with your designer, and handle the permit so inspections go smoothly.
The electrical rough-in happens while walls are open, before insulation and drywall. Getting it right is what makes the finished space work.
Outlets, lights, switches and circuits are planned, and the load is checked against your panel.
A City of Santa Ana permit is pulled, often as part of the overall building permit.
Boxes are mounted and wire is run through the open framing to each location.
The city inspects the open wiring before insulation and drywall cover it.
After drywall and paint, outlets, switches and fixtures are installed.
Everything is tested and the city signs off on the finished work.
Santa Ana has seen many new ADUs and garage conversions. The biggest electrical question is always the same: where will the power come from?
Often the simplest option, fed from a correctly sized breaker in your main panel.
Some detached ADUs get their own utility service, coordinated with Southern California Edison.
Shows whether your existing service can handle the new unit or needs an upgrade.
California’s Title 24 sets lighting and efficiency rules, and some new detached ADUs must include solar. Your designer confirms what applies.
Smoke and carbon monoxide alarms, GFCI and AFCI protection throughout the new space.
Whether you’re managing the project yourself or working with a general contractor, a good electrician fits into the schedule and keeps the job moving.
Remodels vary too much for fixed prices. The electrician gives you a written quote based on your plans and a site visit.
The number of outlets, lights and circuits, and how far they are from the panel.
Whether a subpanel, separate meter or panel upgrade is needed.
Permit requirements, inspections, and access through open walls or finished spaces.
We take calls from every Santa Ana ZIP code: 92701, 92703, 92704, 92705, 92706 and 92707, from historic remodels in Floral Park and French Park to ADUs and additions across the city.
Related: panel upgrades · whole house rewiring · light fixture installation · EV chargers
Quick answers to common questions. Have a question about your home? Call us.
📞 Call (714) 880-7344Usually, yes. Adding or changing circuits, outlets or lighting during a remodel typically needs a City of Santa Ana permit, often as part of the building permit, with rough and final inspections.
As early as possible, ideally during design. That way outlet and lighting locations, appliance circuits and panel capacity are planned before framing and cabinets are set.
It’s the stage where boxes are mounted and wires are run through open walls and ceilings, before insulation and drywall. The city inspects it before the walls are closed.
Most ADUs get a subpanel fed from the main house, and some detached units get a separate meter. A load calculation shows which option fits your property.
Not always. New kitchens, EV chargers, heat pumps and ADUs add load, but many homes have enough capacity. The electrician checks with a load calculation before work starts.
Yes. Electricians regularly coordinate with contractors and designers on schedule, rough-in timing and inspections.
Tell us about your project, your plans and your timeline. We’ll connect you with a licensed remodel electrician in Santa Ana, with the scope and price confirmed before work starts.